Archeologists go on digs and recover artifacts, as they study patterns of human behavior. Studying the archeology of a building is how you might describe the process of an “architectural survey.” Over the last eight years the team at NewStudio Architecture has completed over 300 architectural surveys. I think our clients would agree that surveying is something NewStudio is very good at doing.

site survey by NewStudio Architecture

Sometimes, a survey is a simple, straightforward process. This is especially the case for newer buildings with good, existing documentation. In this situation, we’re usually verifying “actual conditions” for an owner, contractor, and/or future tenant. We do this by carefully measuring and photographing a building (or space inside a larger building) and documenting the building structure, HVAC and electrical equipment, and millwork. This information which might be conveyed by drawings and/or 3D electronic models, is very useful to a building owner, landlord, contractor, tenant, bank, or insurance company.

For older, or historic buildings, or buildings with an extensive history of remodels and additions, the process is one of discovery, especially if architectural plans for the project don’t already exist. In addition to our on-site “detective work,” we may be visiting local historical collections, libraries, or corporate archives to uncover and reveal the “story” of a building, the way in which it was constructed, how it was taken care of, and how the building evolved and adapted to changes in use and occupancy.

NewStudio staff use a tape measure on a building exterior at a site survey.

In addition, for clients thinking of renovating an existing space, or adding on, we gather information from the local zoning and building departments, to provide a full picture of the regulatory process that exists for a property, before an owner even starts a project. This is the kind of “roadmap” you want in place for a successful project.

At the end of the day, we utilize many resources to paint a clear, and as accurate as possible, portrait of an existing space or building for our clients to use in pre-purchase/lease negotiations, as well as a baseline of information for design and construction projects to minimize conflicts and speed up the construction process; or in compliance and legal proceedings.

And, if you’re wondering… no space is too large or too small to be surveyed… from a basement to a boathouse to a warehouse.

Recently I did a Q&A with one of NewStudio’s experts in surveying, Dave Dammar, to learn about his experience in this craft. He had just returned from surveying an over 81,000 square foot building on a historic US Navy Yard.

Q: How many surveys have you done? How many cities have you traveled to?
A: I would say I’ve done about 28 surveys in 18 different cities with NewStudio.

Q: What tools do you use the most on a survey?
A: Camera, iPad Pro with Apple Pencil, laser, and tape. And, sometimes a drone.

Q: How long do surveys usually take?
A: Depending on size, most are done in 1 working day, some do take more.

Q: First step (or steps) to any survey you go on?
A: Find out if the space is currently being used (e.g., as a retail space that has store hours), and if there’s a schedule I’ll have to work around. Then I can coordinate the dates, times, and locations with all involved with the survey. Many of our surveys are out of the state of Minnesota… so next up is finding flights, ground transportation, hotel, etc.

Q: What do you do before you leave the office to get prepared/organized/ready?
A: To prepare for a survey, I study any existing documentation we have available and locate the space in Google Maps and Google Street View. And, I always make sure I have batteries charged for all the equipment that’s coming along!

Q: What about when you arrive in the city or location you are headed to? How do you get started? What’s usually the very first thing you like to do?
A: Find my transportation, map directions to the site, and grab something to eat on the way. Also, of course, I contact whoever I might be meeting at the space to let them know my ETA.

Q: Talk about the process and the steps you go through.
A: I begin by walking through the entire space, usually with the building manager, asking questions about access to all related spaces like gas and electric, and the roof. I’ll need access to everything so that I’ll be able to document everything fully. I also gather more general information about the space, and for example, any landlord or property requirements that might exist.

The walk-through is followed by a photo walk-through where I document the overall space in pictures. And, following the photo documentation, I study any existing drawings and compare, and update them, to show changes and current conditions.

Once I have a complete plan, I usually start at the front of the space and work my way to the back, writing in all dimensions as I go, including heights and ceiling elements. I’ll take pictures of unusual or detailed elements. I always end with one more walk-through to make certain nothing has been missed.

Q: What do you enjoy about surveys?
A: The history of the buildings, seeing behind the scenes and the places that people don’t go, and finding out why something is the way it is. It’s great learning the story of the space. I also like traveling to new and different places—places I wouldn’t normally visit. And, travel always makes me appreciate coming home.

Q: What’s the worst part of a survey?
A: Dust and spider webs, dead animals, hornet’s nests, tall bouncy ladders, roof access hatches, and—sometimes it can get pretty hot, as many spaces we survey aren’t air conditioned.

Q: What’s the weirdest thing you’ve found on a site? 
A: Again, it’s usually the animals, dirt, dust, and spider webs. Once a toilet in the middle of a room, another time a sprinkler pipe running through the middle of a duct, and I’ve seen structural columns cut and notched for mechanical ducting, nothing too crazy…

Q: Talk about the size of this building you just returned from surveying. What was different/ unusual/ interesting about this survey?
A: That massive building has some history. I loved learning about the history of the space and why it is the way it is, looking at the old pictures and drawings, and recreating it virtually in a model. The space is HUGE—over 600 feet long, over 100 feet wide and tall, and there are multiple pits that are multiple stories deep, where they used to put driveshafts for ships standing up vertical to work on them. Those pits have since been filled and covered over.

There’s also an electrical room that was demolished, which has a room below it that is inaccessible because it’s full of water! The original building was half its current length and built in 1917 without any flashing at any of the window penetrations. At least they did figure out to put flashing in when they built an addition in 1938, but it was a little too late, as there was already a lot of rust jacking going on. (Rust jacking is when rust causes metal to expand so much that it pushes on whatever it is next to, causing cracks and separation.) I could go on and on about this place, there is just so much there.

Read more about Dave and other members of our team.

“Frits,” The Behemoth Door

The bottom, fully-mortised pivot hinge straight from the Netherlands. Manufactured by FritsJurgens and a fitting name for a door. The hinges and hardware were all mortised into built-up hardwood blanks.

Upon joining the team at NewStudio, one of the tasks on my to-do list was to construct and install a front door.

Let me clarify: NewStudio’s Saint Paul office is in a 100-plus-year-old, timber-framed, former industrial building. Most of the build-out was designed, fabricated, and installed by my co-workers. Pretty cool, right? When I arrived in September, the project was nearly finished. Amongst other things, trim had been trimmed, the hole in the floor had been cut, a stair had been installed, and a big glass wall had been placed. The office’s front entry was one of the few items that remained to be completed. 

“Frits” fully biscuited and clamped up. 1/8” Baltic birch ply was contact cemented to the solid core door body to add some stiffness to the joints. Ply is then painted black to prepare for redwood finishing.

When I interviewed at NewStudio, I didn't give much thought to the regular-sized, regular-framed temporary door in the entry’s glass wall. I remember saying in my interview that I liked building things, and that I appreciated the process of thinking through designs by making them. I believe my remark was along the lines of “it’s astonishing what you can learn by putting something together.” Someone took note of that statement.

Ideas about the final door had been floating around the office for months. I inherited some sketches, spec sheets, and concepts. With help, I thought through aesthetic decisions, technical details, and specialty hardware. I measured and modeled. Each choice I made seemed to present more questions, and these new questions were also considered. Pieces were ordered, big-box stores were visited, and a generous pile of door materials formed. All that was left was to construct a very formidable, very massive entry door that would definitely make an impression. It wasn’t easy.

Reclaimed redwood siding was ripped down into 1/8” slats for the laminated to the door body for the finish faces of the door.

“I have a newfound respect for the industrially manufactured door,” I mentioned during a team meeting. “Or,” Sean replied, “you have a newfound respect for custom work.” I won’t subject you to the list of specific difficulties associated with scratch building and installing a 300-pound, 4-foot by 10-foot door (rest assured that these difficulties were many and varied). What is worth noting is that the process of thinking through a design by making the design forced an integrated process of planning and adaptation that, in hindsight, nicely encapsulates any good design process.   

Redwood slats are laminated to edge faces of “Frits”. Once the glue is set, we hang a door!

Sean was correct: I now have a higher level of respect for custom design work. While there were moments of difficulty to accompany moments of clarity during the design process, the finished product is elegant, clean, and clear in utility and form. In this one design problem I learned about simple construction, load transfers, remote-entry systems, pivot hinges, mortised handsets, thresholds, egress, steel working, and solid-core door construction. I also learned about the process of designing well: plan, adapt, and repeat.

NewStudio staff peek around the front door of the office.

2019 Color of the Year

Benjamin Moore Metropolitan  AF-690

Benjamin Moore
Metropolitan
AF-690

Pantone  Living Coral  16-1546

Pantone
Living Coral
16-1546

Sherwin Williams Cavern Clay SW 7701

Sherwin Williams
Cavern Clay
SW 7701

PPG Brands Night Watch  PPG 1145-7

PPG Brands
Night Watch
PPG 1145-7

 

Starting off 2019 with COLOR! Above are Color of the Year (CotY) selections from four major brands, and we’re excited to see how these hues are incorporated into projects, spaces, and daily life.

Benjamin Moore’s Metropolitan is a great neutral for many palettes. It’s an excellent foundation when paired with the other, brighter, colors of the year. I see Metropolitan being the sophisticated touch needed in a mostly white space. Put it together with darker charcoals, grays, and even navy for a moodier, more dramatic space. I prefer this color in matte finishes over gloss or shiny. I might need to repaint a room in my house to really experience this color 😊

Pantone’s CotY, Living Coral, intrigues me. I confess I’ve been enjoying ‘Millennial Pink’ and its derivatives over the past few years. Clothes, accessories, home décor (pillows!)… I’ve bought them all. So, I’m happy to say that I don’t see Living Coral as a replacement to the dusty rose and blush shades currently out there. Add this color to an already blush-focused palette to act as a bright spring accent, and energize your space going into summer months. I also think Living Coral will sneak into many palettes, in addition to blush.

The tone of Cavern Clay, by Sherwin Williams, became quite popular in fashion this past fall, so I’m not surprised it is a Color of the Year. While I haven’t used this in as many projects, I see it doing well as a neutral—especially paired with cool undertones like a limestone floor or bleached wood millwork. In a fabric, Cavern Clay will add wonderful warmth and cozy texture to a space.

Night Watch, from PPG, can pair with almost anything. I consider greens a neutral when arranging color for projects, and also in general. In my closet, a green jacket is as much of a neutral as a black jacket. Coupled with golds and rusty browns, Night Watch may start to feel a bit old-world (another 2019 trend), but I see it being quite modern when combined with cool whites and grays, like Benjamin Moore’s Metropolitan. Given its nod to nature and the outdoors, Night Watch is a color that can do a lot—it’s an easy, rich accent to update a space, serene enough to paint an entire room, and makes as great of a dining room color as it does a bedroom, office, or bath.